Year |
Client |
Activity Location |
Brief Description of Works |
1985 |
Keretapi Tanah Melayu |
Gemas to Paloh
- 86km rail-track |
Old track replaced by continuously welded rails with concrete-sleeper & increased ballast bed depth. |
1987-89 |
Keretapi Tanah Melayu |
Slim River to Seremban
- 180 km of rail track |
Vertical and horizontal alignments were optimised within available railway land corridor. |
1988-94 |
Keretapi Tanah Melayu |
Padang Besar, Perlis |
Development of Railway Complex which includes:
Railway passenger terminal with Malaysian and Thai customs, Container depot of 15,000 sq. metre area, Rolling Stock maintenance shed, Living quarters |
1990 |
Chemical Corporation of Malaysia |
Port Klang, Selangor |
Design & supervision of rail sidings for handling of Ammonia loaded wagons. |
1990-92 |
Indian Railway Construction Co. |
Rawang to Seremban 108 km second track |
Construction of parallel track to the existing line. |
1992-94 |
Indian Railway Construction Co. |
Sentul – K.L. – Port Klang - 50 km parallel track |
Rehabilitation of existing line, construction of a second line. Remodelling of 5 station yards & station buildings, construction of 12 new halts. |
1992-94 |
Tasek Cement Bhd. |
Sungai Buloh, Selangor |
Design of rail siding layout and shunting facilities. |
1993 |
Keretapi Tanah Melayu |
Seremban, Negeri Sembilan |
Relocation of railway station and freight yard |
1993 |
Keretapi Tanah Melayu |
Kuala Lumpur |
Design of Track Layout |
1993 |
Keretapi Tanah Melayu |
Batu Junction |
Design of Bypass Link |
1993 |
Esso (M) Ltd |
Port Dickson,
Negeri Sembilan |
Expansion of oil refinery production facilities which includes stabilisation of poor soil, construction of 6 metre high embankment to support rail sidings and rail tanker facilities. |
1994 |
APMC Bhd. |
Padang Jawa , Selangor |
Provision of rail siding and shunting facilities. |
1995 |
Malayan Sugar Manufacturers |
Sungai Buloh, Selangor |
Design of track layout and unloading facilities. |
1995 |
Petronas Fertilizer (Kedah) Sdn. Bhd. |
Gurun, Kedah |
Provision of rail link and associated facilities to Fertilizer Plant. |
1996 |
Government Of Malaysia |
Kulai to Tanjong Pagar Electrified Double Track |
Preliminary engineering design and tender documentation for the Civil, Track and Systems engineering for the proposed commuter service in South Johor. |
1997 |
Tasek Corporation Berhad |
Tasek, Ipoh, Perak |
Remodelling of existing siding to increase capacity of trains. |
1999 |
Time Salam Engineering Sdn Bhd |
Bukit Mertajam -Bukit Merah, Penang |
Design of horizontal and vertical alignment. |
2000 |
Tasek Corporation
Berhad |
Sungai Buloh, Selangor |
Extension of railway sidings. |
2001 |
DRB-Hicom |
Sentul - Batu Caves, Selangor
Electrified Double Track |
Preliminary engineering design, trackworks, earthworks & ground improvement, signalling & electrification. |
2001 |
Government Of
Malaysia |
Seremban-Johor Bahru-
Tg. Pagar |
Preliminary engineering and route alignment study for the proposed double tracking project (DTP) |
2002 |
DRB/Hikmat Asia-MMC/
CRET |
Seremban – Johor Bahru |
Preliminary engineering design, trackworks, earthworks & ground improvement |
2002 |
Gerbang Perdana
Sdn Bhd. |
Johor Bahru Sentral, Johor |
Preliminary engineering design, trackworks, earthwork, drainage & underground improvement to JB Sentral Yard. |
2002 |
DRB/Emrail/IRCON |
Ipoh – Butterworth –
Padang Besar |
Preliminary engineering design, trackworks, earthworks & ground improvement |
2002 |
Satriadesa
Corporation Sdn. Bhd |
Ipoh-Rawang Electrified Double Tracking Project |
Design of all railway temporary cross-overs, earthworks and drainage |
2002 |
Muhibah Engineering Bhd. |
Batu Gajah, Perak |
Detail Design for EMU Depot for KTMB. |
2002 |
DRB-Hicom Bhd. /
IJM Corporation Berhad |
Rawang to Ipoh |
Detail Design of KTMB Quarters and Ancillary Buildings, Rawang – Ipoh Double Tracking Project. |
2003 |
DRB-Hicom Bhd. |
Seberang Prai and Bukit Mertajam, Penang |
Detail Design for Train Car Set Depot, Locomotive Depot and OHLE Depot, Ipoh - Padang Besar Double Tracking Project. |
2003 |
Sin Seong Hin Sdn Bhd |
Mid-Valley Megamall, Kuala Lumpur |
Design, Construction & Commissioning of new railway halt at KM 390.608 between KL Sentral and Seputeh stations (Near Mid Valley Megamall). - Covered Platforms, Lifts, Link Bridges to Mid Valley, Toilets, Electrifications, etc. |
2003 |
Tasek Corporation
Berhad |
Tasek, Ipoh |
Remodelling of existing sidings. |
2003 |
Selama Contractors |
Klang Valley |
Rehabilitation of existing electrified double track
|
2003 |
Gerbang Perdana Sdn Bhd. |
Johor Bahru Sentral, Johor |
Detail engineering design of JB Sentral Yard and systems. |
2004 |
Gamuda Engineering Sdn. Bhd. |
Kluang - Johor Bahru, Johor |
Preliminary engineering design of Kluang - Johor Bahru double tracking project |
2004 |
Loh & Loh Constructions Sdn Bhd |
Kuala Lumpur |
Design Construction and Commissioning of New Railway Halt at Km 375.800 between Sg. Buloh and Kepong Stations |
2005 |
Hikmat Bumimaju Sdn. Bhd. |
Tanjong Aru – Tenom, Sabah |
Rehabilitation and Upgrading of Infrastructure for Jabatan Keretapi Negeri Sabah |
2005 |
Scomi Sdn. Bhd. |
Klang, Selangor |
Detail Design of Steel Portal Frame Structure (20m x 66m) for New Mini Workshop (for KTMB) together with Associated Trackworks and Ancillaries. |
2005 |
UEM Builders Berhad |
Ipoh, Perak |
Rawang – Ipoh Double Tracking Project – Running Bungalow (KTMB Quarters) |
2006 |
Hisniaga Jaya Sdn. Bhd. |
Negeri Sembilan |
Proposed Strengthening and Rehabilitation of Track and Associated Works between Rembau and Tampin Railway Station |
2006 |
Aman Selama Sdn. Bhd. |
Pulau Pinang and Perak |
Rehabilitation and Strengthening of Track and Associated Works Between Bukit Mertajam and Parit Buntar Railway Station |
2006 |
Loh & Loh Constructions Sdn. Bhd. |
Perak |
Rehabilitation and Strengthening of Track and Associated Works Between Parit Buntar and Bukit Merah |
2006 |
Lion Pacific / IRCON |
Perak |
Rehabilitation and Strengthening of Track and Associated Works Between Bukit Merah and Taiping Railway Station |
2007 |
Hisniaga Jaya Sdn. Bhd |
Selangor |
The Upgrading of Wayside Electrical & Mechanical Systems for the Kelana Jaya Line |
2008 |
Ircon International |
Negeri Sembilan |
Design, Construction, Completion, Testing, Commissioning and Maintenance of the Double Track Project Between Seremban and Gemas. |
2008 |
Lhoist (Malaysia) Sdn Bhd |
Tapah, Perak |
Proposed Railway Siding for Bulk Limestone Transport |
2008 |
Glitteria Sdn Bhd
|
Sabah |
Proposed Consultancy and Project Management Services for the Design, Manufacturing, Delivery, Test, Commissioning and Warranty of two locomotives and for DMU sets for Sabah Railway |
2009 |
SP Setia Bhd / JKNS |
Kota Kinabalu, Sabah |
Proposed Development of 5-storey Jabatan Keretapi Negeri Sabah Headquarters, New Railway Station cum Railway Line Reserve and Ring Road System on Lot 01200944 and Part of 01200705 (PT 20-08010062, 20-08010063, 20-08010064, 20-08010087 & 20-08010089) at Tanjung Aru, Kota Kinabalu, Sabah |
2011 |
KL Ecocity Sdn Bhd |
Kuala Lumpur |
Cadangan Tambahan dan Pengubahsuaian pada LRT Stesen Abdullah Hukum sediada dan Cadangan Pembangunan sebuah stesen KTM Komuter 3 tingkat di atas tanah Rezab keretapi di intergrasi dengan LRT stesen Abdullah Hukum sediada, Jalan Bangsar, Wilayah Persekutuan |
2012 |
Skypark Link Sdn Bhd |
Subang Jaya, Selangor |
Proposed Subang Jaya - Sri Subang - Subang Skypark Rail Link |
2012 |
Srijang Kemajuan Sdn Bhd |
Kajang, Selangor |
Kajang 2 - KTM Commuter Station |